Testing Center: Relocation and Service Hours
| Category: General News, Student Information | Comments Open |
| Tags: ACL, construction, distance learning, operations, placement, renovation, testing, testing center, Wythe Hall | |
Thomas Nelson Community College (TNCC) continues to improve services and facilities for its students. One such effort that will occur very soon is the consolidation of the college’s testing operations.
Placement, Make-up and Distance Learning Testing will merge into one office and will be permanently located in room 254, Wythe Hall, on the Hampton campus. In preparation for the relocation, Placement Testing will be temporarily located in the Academic Computer Lab (ACL), room 255 ,Wythe Hall, beginning on Monday, June 25.
Make-up Testing hours for Thanksgiving Week
| Category: General News | Comments Open |
| Tags: students, testing | |
Please be aware of these changes in the Make-up Testing Center schedule during Thanksgiving week:
- Monday, Nov. 23rd, 9 a.m. – 1 p.m. and 2 – 5 p.m.
- Tuesday, Nov. 24th, 9 a.m. – 1 p.m. and 2 – 5 p.m.
- CLOSED Wed. Nov. 25 – Sunday, Nov. 29th.
As a reminder, students are required to show photo identification, and tests will not be distributed later than one hour before closing time. If you have questions or need additional information, please contact Michele Ross, Testing Specialist, at 825-3540 or rossm@tncc.edu.
TNCC Receives Update on Air Monitoring Tests
| Category: General News | Comments Open |
| Tags: air quality, alert, closure, HVAC, testing, update | |
Thomas Nelson Community College has received initial results from air monitoring tests conducted by a private contractor on Friday, September 7 in Griffin Hall. Results indicate there is no presence of substances above hazardous exposure levels in the building. The testing contractor has advised that the College can occupy the building. The College is expecting a formal written report to be submitted by the testing contractor next week.
The College’s HVAC contractor has engaged a duct cleaning company to clean and sanitize the existing duct work in Griffin and Wythe Hall. In addition, the College has requested the contractor secure the services of a vendor to perform surface wiping and HEPA vacuuming of the section of Griffin Hall that was closed. This work is commencing today and is expected to be completed by Sunday, September 16.
